Parel To Haji Ali In 10 Minutes: 6-Lane Bridge To Cut South Mumbai Travel Time

A 1.5-km six-lane elevated road will link Haji Ali’s coastal road to Senapati Bapat Marg, easing traffic towards Parel. The project will cost around Rs 250-Rs 300 crore

Auto